Process case · Industrial reuse

Before replacing a cassette, check whether its structure is still valid.

A roll forming project started with cassettes that had been out of service for years. The quick answer would have been to make entirely new tooling.
01 / Technical assessment

What we checked

Before making that decision, the team reviewed the geometry of each station, compatibility with the new process, the structure that could be retained and the components that needed redesign.
Existing architecture · Elements to review · Validated proposal
FAVARITX engineering — illustrative image
02 / A better basis for the decision

What changed

Age stopped being the deciding factor. The decision shifted to which parts of the existing architecture could still support the process, and which parts had to be adapted.
Before making new tooling, determine which parts of the existing architecture still have a sound technical basis.

Have a similar technical challenge?

Start with your profile, your installation and the decision you need to make. Discuss a similar technical challenge

Explore the process

Explore Steel Frame roll forming capacity, automation and process validation.

Images illustrate FAVARITX engineering and are not a record of this specific project.